A busy orthopedic practice does not send one kind of claim.
A new-patient visit does not bill like a knee injection. A knee injection does not bill like an arthroscopy. And the visit two weeks after that arthroscopy may or may not be separately payable.
Our job is to understand that claim mix and manage the billing around it.
Surgery and global periods
Many orthopedic procedures have global periods that affect how post-op visits and related services are billed. Some follow-up care may be included, while unrelated problems, certain staged procedures, or returns to the OR may be separately payable depending on the circumstances.
We track the global period so separately payable work is billed appropriately and bundled services are not submitted unnecessarily.
Fracture care
Fracture care has its own rules. Whether the fracture was treated with or without manipulation, who provided the initial care, and who is following the patient all affect how the claims should be built.
Modifiers
Modifiers play a major role in orthopedic billing, including laterality, distinct procedures, staged or related returns to the OR, and significant visits performed on the same day as a procedure.
A missing or incorrect modifier can lead to denials, reduced reimbursement, or unnecessary follow-up.
Injections and drugs
Joint injections, viscosupplementation, and other drug-related services involve both the procedure and the drug, plus units, imaging guidance, documentation, and payer coverage rules.
Small errors in units, documentation, drug billing, or procedure coding can repeat across a large volume of claims.
Imaging
In-office X-ray and other imaging can involve professional and technical components. The claim needs to reflect what your practice performed and owns.
Prior authorizations
MRIs, surgeries, and some injections often need payer authorization before the service.
We review whether the authorization matches the service, date, site, and payer before submission when that information is available.
DME and bracing
Braces, splints, and other DME come with documentation and supplier requirements of their own.
We review the documentation and supplier requirements that can cause DME claims to delay or deny.